Disaster Management · Disaster and disaster management · Lesson 3 of 3 · 12 sections · about 33 min read
Based on: NDMA guidelines (cyclones 2008, floods 2008, earthquakes 2007, heat wave action plans 2019, cooling centres 2025, CBDRR 2024) and hazard pages; IMD/RSMC New Delhi cyclone terminology; IMD heat wave FAQ; Odisha State Disaster Management Authority; UNESCO-IOC Tsunami Ready; Ahmedabad Heat Action Plan; Centre for Policy Research, heat action plan assessment (2023); Kerala PDNA (2018); BIS IS 1893 (Part 1): 2016; Gadgil (WGEEP 2011) and Kasturirangan (HLWG 2013) reports
Mitigation: the toolkit
In plain words: Mitigation means reducing the scale of a disaster before it happens. It works in two ways: structural measures are physical works such as shelters and embankments, and non-structural measures are rules, plans and warnings. The table pairs each kind with examples, and the bullets explain why the two should be combined.
Mitigation means reducing the scale of a disaster before it happens. It works through two kinds of measures, and UPSC expects both in any answer.
Structural measures
Non-structural measures
Cyclone shelters, embankments, dams and reservoirs, sea walls, drainage
Hazard mapping, land-use zoning and floodplain zoning
Earthquake-resistant design, retrofitting of schools and hospitals
Building codes and their enforcement (IS 1893, National Building Code 2016)